Get Certified in minimum time
Main Features:
100 Questions
No repetition of questions
Scenario-based questions
2 Practice tests
Specially designed for SAP S/4HANA Production Planning and Manufacturing Certification Exam
Ideal for C_TS422_1909, C_TS422_1809
SAP Certification Exam Facts:
80 questions
3 hours
Passing 55%(C_TS422_1909) & 68%(C_TS422_1809)
All question have same weighting ( every question is worth 1 point )
No partial scoring ( you get one point for the entire question or nothing )
Questions from same topic stay together, topic sequence is randomized
Source material is course handbook / e-book
Same 80 questions for everyone and every time
Always objective, never opinion based
No true/false questions
Sample Questions and answers:
01. What generates capacity requirements in a process order?
Please choose the correct answer.
a) Activities
b) Phases
c) Operations
d) Resources
Answer: b
02. You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?
Please choose the correct answer.
a) Top of Green
b) Top of Red
c) Top of Yellow
d) Top of Red Base
Answer: a
03. Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.
a) Storage location data
b) Warehouse number data
c) MRP area data
d) Production version data
Answer: a, b
04. A material in your company is planned with planning strategy 70 (Planning at assembly level).
The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards?
Please choose the correct answer.
a) From the planned independent requirement date of the material
b) From the requested delivery date of the related finished good
c) From the availability date of the related finished good
d) From the dependent requirement date of the material
Answer: d
05. Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.
a) Sales orders
b) Planned independent requirements
c) Shipments
d) Material documents
Answer: a, b