4.7  3 reviews on Udemy

SAP S4HANA Production Planning & Manufacturing Practice Test

We assured, you will definitely clear the exam if you go through all questions in this preparation test.
Course from Udemy
 19 students enrolled
 en
Get Certified in minimum time
Strong Knowledge on SAP S/4HANA Production Planning and Manufacturing Certification Exam (C_TS422_1909, C_TS422_1809)

Get Certified in minimum time

Main Features:

  • 100 Questions

  • No repetition of questions

  • Scenario-based questions

  • 2 Practice tests

  • Specially designed for SAP S/4HANA Production Planning and Manufacturing Certification Exam

  • Ideal for C_TS422_1909, C_TS422_1809

SAP Certification Exam Facts:

  • 80 questions

  • 3 hours

  • Passing  55%(C_TS422_1909) & 68%(C_TS422_1809)

  • All question have same weighting ( every question is worth 1 point )

  • No partial scoring ( you get one point for the entire question or nothing )

  • Questions from same topic stay together, topic sequence is randomized

  • Source material is course handbook / e-book

  • Same 80 questions for everyone and every time

  • Always objective, never opinion based

  • No true/false questions

Sample Questions and answers:

01. What generates capacity requirements in a process order?

Please choose the correct answer.

a) Activities

b) Phases

c) Operations

d) Resources

   Answer: b

02. You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?

Please choose the correct answer.

a) Top of Green

b) Top of Red

c) Top of Yellow

d) Top of Red Base

   Answer: a

03. Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?

There are 2 correct answers to this question.

a) Storage location data

b) Warehouse number data

c) MRP area data

d) Production version data

   Answer: a, b

04. A material in your company is planned with planning strategy 70 (Planning at assembly level).

The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards?

Please choose the correct answer.

a) From the planned independent requirement date of the material

b) From the requested delivery date of the related finished good

c) From the availability date of the related finished good

d) From the dependent requirement date of the material

   Answer: d

05. Which of the following elements does the MRP run take into account?

There are 2 correct answers to this question.

a) Sales orders

b) Planned independent requirements

c) Shipments

d) Material documents

   Answer: a, b

SAP S4HANA Production Planning & Manufacturing Practice Test
$ 19.99
per course
Also check at

FAQs About "SAP S4HANA Production Planning & Manufacturing Practice Test"

About

Elektev is on a mission to organize educational content on the Internet and make it easily accessible. Elektev provides users with online course details, reviews and prices on courses aggregated from multiple online education providers.
DISCLOSURE: This page may contain affiliate links, meaning when you click the links and make a purchase, we receive a commission.

SOCIAL NETWORK