Sample Questions:
The primary goal is to improve the removal of waste water Order season, where the time _________________ during the time the payment is packed.
shift start
Research and development
Upon receipt of the order
new financial year
None
Belt rearranged for the location of the inventory component rework station for locating used parts most often are up to your fingertips repair person. This rearrangement of result edin faster repair times by eliminating one of the seven most important factors in waste, which is waste of
movement
transport
inventory
Waiting
None
What best describes the elements of Waste "unnecessary movement of materials and goods"?
over Processing
inventory
movement
transport
None
The waste of overproduction is defined as ______________________.
Unnecessary people and equipment
Liability materials are bought and placed immediately sold or used
Producing more than the needs of the next step, or more than the customer buys
Excess movement of material
None
English words are used in 5S are __________, _____________, Shining, Standardizing and maintaining. (Note: There are 2 correct answers).
Adaptation
separation
transition
straightening
Appropriate measures mean that the measurements are ______________.
Representative
sufficient
context
relevant
All of these answers are correct
What factors Measurement Systems Analysis (MSA) studies are applicable to the process used to measure does not damage the part?
Destructive variable Gage R & R Study and crossed the
Destructive variable Gage R & R Study and nested
Nondestructive variable Gage R & R Study and crossed the
Nondestructive variable Gage R & R Study and nested
None